Find your first great cut.
A folder of footage is not a film yet.

Momentium Creative SuiteOne of four creative products
Browser Lite / OPEN FOR EXPLORATION
Find the rhythm. Make the cut.
Start a video project, explore the timing and refine the sequence in Browser Lite.
Browser Lite · desktop Pro features and release status are separate


Hold a shot, shape its color, weave in type or blend another scene. Follow the AutoCut workshop when you want to explore beat-driven editing.
These projects include real clips and soundtracks from the channel: Ecstatic Dance, I FEEL ALIVE, California Coast and Joshua Tree, Roadtrip Around KAUAI, and Day In The Life. Open a mini studio, change the film, and keep your editable version.
Watch the original collection ↗A folder of footage is not a film yet.

The second scene looks pasted on.

The footage has no shared visual mood.

The best movement passes too quickly.

A beautiful shot still needs a memorable message.

The opening waits too long to reveal the next shot.

The transition calls attention to itself.

The wide edit loses its focal point on a phone.

Coast and Joshua Tree: tease the setting, reveal a person, and finish on the strongest landscape. AutoCut supplies timing; you decide which shots tell the story.
Ecstatic Dance or I FEEL ALIVE: blend light over performance, land kinetic type on an accent, and use one speed change to make a gesture memorable.
Day In The Life: trim to small details, move a phrase through the frame, and keep the color treatment consistent across the film.
These lessons run native analysis, sequence editing, track blending, grading, titles, remapping, framing, and browser delivery. Preview and export share the same compositor.
Native overlay track blends: Normal, Screen, Multiply, Overlay. Desktop composition layers also support Lighten, Darken, Difference, and Color Dodge.
Desktop Pro goes further: editable masks and rotoscoping, point and planar tracking, 3D compositions/cameras, effect graphs, transcript editing and story assembly, color scopes/Curves/LUTs, audio buses, professional interchange, and queued deliveries. These are deeper lesson directions, not unlocked desktop features in a browser preview.
INSIDE SCENEPILOT
Find the rhythm of your footage, then shape the edit, sound, and motion.
19features to explore
Bring in audio and video and manage linked source files.
Try this in an exampleAnalyze music or footage and generate an editable starting sequence.
Try this in an examplePreview a proposed cut before applying it to the active edit.
Try this in an exampleArrange, split, trim, move, and refine clips.
Try this in an exampleMark source ranges and use supported insert, overwrite, and fit-to-fill workflows.
Combine multiple video and audio tracks.
Preserve supported picture/audio relationships during editing.
Decoded waveforms, clip gain, panning, fades, crossfades, and volume automation.
Supported speed changes, rate stretching, and professional trim operations.
Apply and preview available transitions, effects, grading, and generated visuals.
Try this in an exampleCombine text, footage, shapes, and other layers in reusable compositions.
Keyframes, easing, value graphs, motion controls, parenting, nulls, and precompositions.
Nested compositions, masks, mattes, and supported blending workflows.
Person and object isolation paths, plus removal tools requiring shot-by-shot review.
Speech transcription and transcript/caption editing workflows.
Media bins, proxies, relinking, recovery history, and saved projects.
Extension packs containing compositions, looks, and effect recipes.
Browser Lite targets local 1080p H.264 delivery; Pro adds broader profiles, 4K workflows, and a persistent render queue.
Try this in an exampleSupported WAV stem and OpenTimelineIO workflows.
01 / INSIDE THE STUDIO
Cut a sequence. Open a composition. Design a look. Keep your ideas connected, and every decision editable.
EDIT / THE MASTER SEQUENCE
A professional Master Sequence brings your clips, sound and nested compositions together.
COMPOSITION / LAYERS WITH A LIFE OF THEIR OWN
Create a comp from your project settings, then move between the scene and the sequence without flattening the idea.
FX / A STARTING POINT, NOT A PRESET PRISON
Explore effect primitives and editable stacks, then build deeper combinations in the composition graph.
Captured from the current development build. Public downloads may be an earlier version. Click a workspace to inspect it.
02 / FOLLOW THE WHAT-IF
Explore every built-in clip effect, then go further with looks, lighting, transitions, motion and typography. Real ScenePilot renders. Your next idea starts here.
Explore the rendered library
ORIGINALNOIR / 100%
RENDERED IN SCENEPILOT / LOOKS
Strip away the color. Keep the drama.
Drag the divider to compare.
Actual ScenePilot renders, not website filters. Three pre-rendered strengths for still effects; manually stepped samples for temporal presets. Timing tools use a moving test card and a demonstration beat grid. No autoplay or flashing playback. Render details.
Build your own effect stackNo matching effects. Try a different search or choose all families.
All 27 clip effects, plus built-in looks, grades, transition, strobe, punch, shake, stutter, speed, echo and text-animation presets. Custom graphs, imported LUTs, masks and user-authored compositions have no finite preset list and aren’t represented as exhaustive examples here. Photograph by Johannes Mändle / Unsplash. Current web/shared compositor renders; not a native Pro parity claim.
Curves, 3D LUTs, temperature and green/magenta tint.
Keyframes, expressions, particles and animated typography.
Blend modes, masks, mattes and connected effect graphs.
03 / AUTOMATION WITH AN OFF SWITCH
Music mode works from beats, transients and energy. Cinematic mode focuses on footage and pacing. Choose the direction—and change it when the story changes.
Three real first cuts give you starting points, not finished answers. Every cut can be moved, trimmed or rebuilt.
Meet Auto DirectorBalanced: 8 shots across 8 bars. A cut on each downbeat.
Silent, illustrative timing demo—not music analysis. In ScenePilot, import your own song to analyze and correct its beat grid. No flashing strobe preview.
04 / GO DEEPER ON DESKTOP
A resilient desktop engine for local media, deeper finishing and the parts of the process you shouldn’t have to babysit.
Local semantic subject isolation with foreground/background guidance, temporal propagation, refine tools and disk-backed alpha caching.
Desktop Pro · supported models and hardware requiredMulti-track mixing, gain, pan, fades, automation and dedicated stems. Native/PCM processing and BS.1770 integrated LUFS analysis.
Mix, measure and deliverA shared frame model drives preview and export. Pro adds a hybrid render queue, proxies, cancellation, recovery and missing-media relinking.
Codec and acceleration support vary by system05 / CHOOSE YOUR STARTING POINT
Two editions. One creative direction. Try the browser workflow or explore the desktop preview.
BROWSER LITE
FREE TO TRYOpen a tab and explore the core workflow. No source-media upload is required for local editing.
Browser memory and codec limits apply. Layered compositions require Desktop Pro.
DESKTOP PRO
EARLY ACCESSThe desktop workflow adds native media tools, local AI options and deeper delivery controls.
Apple Silicon preview · check release requirements.
A FEW GOOD QUESTIONS
No. Music-aware editing is a strength, but the timeline, compositions, color and audio workflows also support narrative edits, social videos and motion-led visual work. Music and Cinematic modes are creative starting points, not separate project formats.
Yes. Auto Director creates an editable arrangement. You can change the pacing, adjust timing, protect choices and refine individual clips. Analysis is a starting point; it is not a guarantee of perfect transient detection or creative judgment.
The workspace tour uses captures from the ScenePilot development build. The effects gallery uses actual ScenePilot renders at three strengths, with the same source photograph for every comparison. The pacing demo is an illustrative website animation. Public release builds may lag behind the development build.
No source-media upload is required for the core local editing workflow. Browser Lite uses your browser; Desktop Pro adds native local media tooling. Local AI features require their supported models and hardware.
Not yet. ScenePilot brings editing, music automation and motion into one developing suite. It is an early-access product, not a claim of full Adobe feature, plugin or production-certification parity. Test important workflows with your own media before relying on it for a delivery.
YOUR IDEA DOESN’T NEED ANOTHER TAB.
AFTER HOURS / ScenePilot / Browser Lite
Bring three original visual studies and a freshly mixed soundtrack into an editable cinematic sequence.

Three original five-second clips bring the artwork, jacket and Form clasp into the media bin. The real StemDeck mix supplies the 18-second soundtrack.

Cinematic mode analyzes the soundtrack at 104 BPM and creates ten master clips, with five additional overlay placements. The sequence stays editable.

The incoming edit changes from Zoom to a 0.30-second Dissolve, then applies to every master edit. The program monitor shows the resulting layered picture.

After saving and reloading, Restore saved project brings back the three source clips, soundtrack, 15 timeline items and effects. A real exported cut JSON preserves the edit map.
Actual Browser Lite session. Source clips use original artwork, jacket references and the Form render. The downloadable JSON contains edit metadata and requires the source files. MP4 export canceled before writing a file; no rendered video is claimed.
Browser Lite / WORKFLOW GALLERY
Real sessions. Four useful moments. A closer look at what you can make.

Choose an aspect ratio and begin a browser video project.

Analyze an original test clip to reveal timing and shot information.

Continue with a normal editable timeline after analysis.

Inspect the available Browser Lite effects and editing controls.
Original synthetic test footage. These are Browser Lite captures; the full native Pro workspaces have a different feature set. Browser codec and export support varies. Actual browser captures · September 29, 2026.